Wednesday, November 27, 2024
BUILT Program
Strength
On 15 Min running clock, build to 1RM:
Hang Power Clean + Push Jerk
Stimulus: Heavy / Technique
*Hang position is anywhere from below the knee up to mid-thigh
Conditioning
For time:
21 - 15 - 9
Box Jump Over (24/20)*
Hang Power Clean (135/95)
Stimulus: Reach
Target: 5 - 8 Mins
*Step-down!